Lake Marblehead Dam Rehabilitation

Rehabilitation of the Lake Marblehead dam in Clemmons: clearing, mass grading, a sand filter dewatering pipe at the toe, and unsuitable soil dug out of the dam core.

Scope

What our crews did

Location
Clemmons, NC
  • Clearing and grubbing
  • Mass grading
  • Sand filter dewatering pipe at the toe of the dam
  • 2,000 CY borrow pit
  • Erosion control
  • Excavating unsuitable soil from the dam core
  • Final seeding and matting